Edition TwoMilan in the heart of Kuala Lumpur
Arte Star · Sungai Besi, Kuala Lumpur

The Milano

Starting From RM340K 527 – 947 sqft

A transit-attached residence drawing from the soul of Italy — clean lines, rich texture, relaxed elegance. Built where the nation's transport future converges.

996SOHO Units
3Rail Lines
Q4'29Completion
First-of-its-kind Façade

A skyline tribute to Italian craft.

The Milano's illuminated façade traces the gothic arches and spires of Milan's Duomo across the tower — a landmark silhouette that announces the address from the expressway, day and night.

The Investment Case

Where Kuala Lumpur's transport future converges.

01 / Thesis

Few addresses sit on three operational rail lines and a future high-speed rail terminus at once. The Milano does — at an entry price built for rental yield, not just capital growth.

90min
KL to Singapore via the future KL–SG HSR terminus nearby
2,705
Total SOHO units across the master development's three editions
99yrs
Commercial leasehold tenure to 2118 — flexible leasing strategy
RM0.30psf
Estimated maintenance fee, keeping holding costs low for landlords
Transit-Oriented Development

One door. Six ways into the city.

02 / Connectivity

The development is physically attached to KTM Salak Selatan, with the LRT and upcoming MRT 3 stations within walking distance — then the wider network from there.

Attached0 transfer
KTM
KTM Salak Selatan
Direct back-access from the development
WalkWalking distance
LRT
LRT Salak Selatan
Sri Petaling Line
WalkUpcoming
MRT 3
MRT 3 Salak Selatan
Circle Line interchange
1Stop away
KTM
Terminal Bersepadu Selatan
150+ destinations south, east & north
3Stops away
HSR
Bandar Malaysia & HSR Terminus
Future KL–Singapore high-speed rail
9km drive
ROAD
Mid Valley · KLCC 10km · TRX 8km
Plus direct Salak Expressway access
Development Component

Sixty-five levels, read top to bottom.

03 / The Tower
Basement Car ParksLG–B2
Drop-Off Lobby & RetailGF
Podium Car ParksP1–P11
Recreational FloorR
SOHO Residences1–50
Sky Facilities51

Sky FacilitiesLevel 51

Bambini Playhouse and Sky Camp crown the tower — rooftop programming with skyline views toward KLCC and Merdeka 118.

SOHO ResidencesLevels 1–50

996 flexible units from 527 to 1,185 sq ft, semi-furnished with hackable walls. Twenty per floor, one to two car parks each.

Recreational FloorLevel R

Capri Club Pool (≈3,600 sqft), Roma Gym (≈3,000 sqft), Lemon Lounge and Maze Garden — Milan rendered in tile, brass and citrus.

Podium Car ParksP1–P11

Speed ramps run through three podium floors for an easy drive up, with EV charging bays and 134 visitor bays across G & LG.

Ground Floor RetailGF

Seven retail lots at street level — grocery, F&B, wellness, childcare and pharmacy — anchored by a BilaBila Mart.

Basement ParkingLG–B2

OTIS lifts run basement-to-summit — the same vertical-transport name trusted at Burj Khalifa and KLCC.

Themed Facilities · La Dolce Vita

Amenities that let space show off.

04 / Facilities
Recreational Floor

Capri Club Pool

A 3,600 sqft checkerboard lagoon framed in green-and-ochre Italian tilework.

Recreational Floor

The Roma Gym

3,000 sqft of strength and conditioning with a skyline backdrop.

Lounge

Lemon Lounge

Garden

Maze Garden

Level 51

Sky Camp

Arrival

La Vita Lobby & Welcome Plaza

A grand arched arrival sequence — the moment a guest knows they've arrived somewhere considered.

The Details

Everything an underwriter asks first.

05 / Details
LocationSungai Besi, Kuala Lumpur
Land SizeApprox. 4.29 acres
Land TitleCommercial
TenureLeasehold 99 years (to 2118)
Development TypeTransit-Oriented Development — SOHO (under HDA) + Retail Lots
Edition 2 Units996 SOHO units · 20 per floor
Built-Up527 – 1,185 sq ft
Car Parks1 – 2 per unit · 134 visitor bays
Total Levels65 levels including car parks · Sky facilities at L51
LiftsOTIS — basement to summit
MaintenanceEst. RM 0.30 psf (excl. sinking fund)
CertificationGreenRE Gold
CompletionQ4 2029 (Edition 2)
GreenRE Gold Certified

Lower running costs, by design.

06 / Sustainability

High-performance green features cut the building's daily operating costs — a direct line to healthier net yields and lower maintenance recovery for owners.

Water-efficient fittingsNatural daylighting Energy-efficient lightingNatural ventilation Efficient lift systemUV-resistant glazing Efficient air-conditioningLow-VOC finishes
Register Your Interest

Live beautifully.
No passport needed.

Be first to receive The Milano price list, floor plates and investor yield projections. Priority registration for Edition 2 is now open — message us directly.

Chat with us on WhatsApp Or tap to request the investor pack →
Sungai Besi · Kuala Lumpur · Completion Q4 2029
WhatsApp Us